Dating back to 1935, The Church of Our Lady of Perpetual Succour was constructed and faced using local granites, mainly Wicklow grey granite and contains some fine works of art of national and international importance.
The Challenge
It became necessary to update the building’s heating system for the needs of the congregation. The system chosen had to blend with the beautiful aesthetics.
The Solution
Our Zehnder Charleston Multi Column Radiators were selected due to their classic and elegant profile. An angled chrome plated valve set was paired to meet the finish requirements.
Some of the main benefits achieved with the Multicolumn are;
- Fast heat up with substantial emissions
- Extremely robust and easy to clean
- Tested to current EN442 requirements
- Curved and angled to suit site design
- Floor and wall mounted options